|
|
|
|
| Work
in progress with FS layout. |
|
Company
reception area. |
|
|
|
|
|
Door matching. |
|
- |
|
|
|
|
| "Mouth"
matching the front gate |
|
Positive
flow: Main Entrance. |
 |
|
 |
| - |
|
Re-correcting
door direction for positive qi. |
 |
|
 |
| Re-correcting
door direction |
|
Time-Space:
Changing the Twenty-Year construction cycle (major renovations) |
 |
|
 |
| Installation
work |
|
Preinstallation
Work: Drainage Piping (Incoming Flow) |
 |
|
 |
| Koi
Pond Design: Water Feng Shui based on Classical application |
|
Feeding
Japanese Koi |